Workplace, Apartment & Shared Parking

Commercial EV Charging Stations

Plan electric vehicle (EV) charging around who parks, how long they stay, and the available power. We assess electrical installation for properties in the San Francisco Bay Area.

Get a Quote →
Parking Review Power Assessment Phased Planning

Discuss your project

Tell Us About Your Project

Choose a service, enter the project city, and share any details that may help us understand the work. You can edit these fields before sending the form.

Serving homes and businesses in the San Francisco Bay Area and Santa Cruz.

(650) 550-0719

Fox Electric is the marketing name of Fox Global Holdings LLC. CSLB #1145945, C-10.

Add address, email or project details (optional)

Name and phone are required. Email, ZIP code, and project details are optional.

Homes
Residential Electrical
Business
Commercial Electrical
Local
Bay Area

Before selecting stations, decide who will use them and who will manage access, electricity costs, and maintenance. We review the parking layout and available power with you. Electrical work, network services, and any future expansion need clearly assigned responsibilities.

AI-generated illustration of electric vehicle charging in shared parking

Document the shared-parking project before requesting approval

Identify the assigned space, candidate electrical supply, route, common-area impacts, billing, ownership, maintenance, permits, and future charging demand.

Can the nearest meter automatically supply the charger?

No. Ownership, access, available capacity, routing, and property approval must be established for the proposed connection.

What belongs in a property request?

Include the location, supply, route, restoration, access, billing, maintenance, and the decisions that still require review.

What We Install

Commercial EV Charging Services

Illustration of a commercial Level 2 charging pedestal beside marked parking

Level 2 Charging

Level 2 stations use a dedicated higher-voltage circuit to charge parked vehicles. Choose equipment around parking duration, vehicle connectors, and available electrical capacity.

Illustration of public charging stations with payment interfaces and pedestrian access

Public Charging Planning

Public charging adds parking access, payment, maintenance, and equipment-support decisions. High-power fast charging requires a separate feasibility and contractor-scope review.

Illustration of charging stations serving resident spaces in a shared apartment garage

Apartment & Condo Charging

Decide whether spaces are assigned or shared, who pays for electricity, and who approves work on shared property before selecting equipment.

Illustration of an office parking area with employee vehicle charging stations

Workplace Charging

Match station access and charging hours to employee and visitor parking. Confirm network subscriptions and operating responsibilities with the charging provider.

Illustration of electric delivery vans parked beside wall-mounted depot chargers with a clear access aisle

Fleet Charging Planning

Start with vehicle specifications, daily travel, and departure times. Those requirements guide the charging schedule and power assessment.

Illustration of capped conduits and prepared foundations for future charging stations

Future Charging Infrastructure

Plan conduit, the protective tubing for wiring, and electrical capacity for possible expansion. Future stations still need an equipment and capacity review.

How It Works

How a Commercial EV Project Works

Confirm power, parking, equipment, and operator responsibilities before installation.

1

Assess Parking & Power

Review parking use and the existing electrical supply. A load calculation, an assessment of electrical demand, helps determine the capacity available for charging.

2

Define Equipment & Responsibilities

Select the charging approach and identify utility, permit, accessibility, and network-provider responsibilities before ordering equipment.

3

Install the Agreed Scope

Coordinate cable routes, parking closures, and electrical shutdowns. Load management, which limits or shares charging power, is considered where compatible with the design.

4

Test & Hand Over

Commission the installation by checking operation and configured power limits. Assign account activation, payment setup, and ongoing support to the named provider.

Technician working on a wall-mounted EV charging unit
Planning Example

Workplace Charging Planning Example

For an employee parking lot, first compare arrival and departure times with charging needs. The assessment would check available power, cable routes, and whether compatible power sharing fits the charging schedule. This is a planning example, not a completed installation.

  • Use: Establish parking duration and station access
  • Power: Compare charging demand with available capacity
  • Operations: Assign network accounts, fees, and maintenance
  • Expansion: Record assumptions for future stations
Pricing

Project Pricing

Individual charging station Quoted after scope review
Multiple charging stations Quoted after scope review
Future cable routes and capacity Quoted after scope review
Utility or building-supply changes Quoted after scope review

The proposal identifies equipment, installation, access, and coordination costs after a site review. Utility charges, design, testing, and other trade work must be identified as included or separate.

The Fox Difference

Why Businesses Choose Fox Electric

Property-Specific Planning

Review parking ownership, access, and electrical supply together so the installation fits how the property operates.

Operating Costs in View

Consider electricity, network subscriptions, maintenance, and support alongside installation cost.

Funding Checked Separately

Confirm current program rules before relying on an incentive. Funding approval and application services are separate from installation.

Power Limits Explained

Compare charging demand with available capacity and explain how power sharing may affect each vehicle.

Utility Coordination

Identify the serving utility and customer approvals. A utility upgrade has its own review and schedule.

Parking & Shutdown Planning

Agree on affected spaces, accessible routes, and any power interruption with building management before work begins.

FAQ

Commercial EV Charging Questions

What charging equipment should we consider?

Start with how long vehicles stay parked and which connectors they use. Level 2 charging is one option for longer parking periods. Fast charging needs a separate feasibility review; equipment support and installation capability must be confirmed for that scope.

Do we need a panel or utility upgrade?

We need the existing equipment ratings and a demand assessment to answer. Compatible load management may limit charging to available capacity, but can reduce charging speed when other loads are high.

Can we include rebates in the budget?

Treat incentives as unconfirmed until the program administrator verifies the site, equipment, application timing, and funding. Do not order equipment based solely on an assumed rebate.

What affects the installation schedule?

Equipment availability, design review, permits, cable routes, parking work, and utility involvement can all affect timing. We identify the known dependencies in the proposal.

How does apartment or condo charging differ?

The property must decide on space ownership, shared power use, approvals, and ongoing costs. The electrical scope should match those decisions and the approved site layout.

Can users pay for charging?

Some networked equipment supports payment and user access controls. Confirm fees, account ownership, activation, and support with the provider; those services are included only if specified in the proposal.

Who checks accessibility requirements?

The project designer and local reviewing authority determine the applicable layout and access requirements. Resolve parking dimensions, routes, and equipment placement before construction; a station count alone does not establish the full design.

Can we add more stations later?

We can discuss routes and capacity for phased work. Keep future assumptions in the plans, then recheck demand, equipment, and permit requirements before adding stations.

Get in Touch

Planning Charging for Your Property?

Tell us the location and how the parking spaces are used. Call (650) 550-0719 or request an assessment.

Ask about the scope and fee for an assessment, diagnosis, or inspection before booking.

(650) 550-0719
Call Request a callback