CSLB #1145945 - Licensed C-10 Electrical Contractor
(650) 550-0719
Generator Installation

Plan Backup Power Around Your Needs

Generator Installation

Decide what needs power during an outage before selecting a generator. We assess electrical connections and transfer equipment in the San Francisco Bay Area, with fuel work, placement, and existing solar or batteries reviewed separately.

Request a callback →
Backup Load Review Transfer Planning Fuel Coordination Scope Review

Discuss your project

Tell Us About Your Project

Choose a service, enter the project city, and share any details that may help us understand the work. You can edit these fields before sending the form.

Serving homes and businesses in the San Francisco Bay Area and Santa Cruz.

(650) 550-0719

Fox Electric is the marketing name of Fox Global Holdings LLC. CSLB #1145945, C-10.

Add address, email or project details (optional)

Name and phone are required. Email, ZIP code, and project details are optional.

Homes
Residential Electrical
Business
Commercial Electrical
Local
Bay Area
Backup Power Solutions

What We Review & Install

Compare the loads you want to support with the generator and transfer options. Equipment selection, placement, fuel work, and operating limits all affect the plan.

Standby Generator Planning

Standby Generator Planning

A standby generator is permanently installed backup equipment. Select capacity and placement around the loads you want to support, fuel supply, and the equipment instructions.

Automatic Transfer Equipment

Automatic Transfer Equipment

A transfer switch changes the electrical supply between utility and generator power. Automatic equipment needs a compatible design and operational testing.

Portable Generator Connections

Portable Generator Connections

A suitable transfer arrangement separates generator power from utility power. Portable generators produce carbon monoxide, a poisonous gas you cannot see or smell. The U.S. Consumer Product Safety Commission advises outdoor operation at least 20 feet from homes, with exhaust directed away from buildings, windows, doors, and vents. Never operate one in a home, garage, shed, or other enclosed or partly enclosed space, even with doors open.

Backup Load Priorities

Backup Load Priorities

Load management limits or sequences equipment demand. Identify essential circuits and starting requirements before deciding whether a smaller generator can meet the plan.

Outage Preparation

Outage Preparation

Discuss the expected use, fuel availability, and maintenance needs. A generator has operating limits and does not guarantee uninterrupted power throughout an outage.

Maintenance Planning

Maintenance Planning

Follow the specific manufacturer maintenance schedule and operating instructions. Confirm the servicing provider and any authorized startup requirements before purchase.

Our Process

Quote to Power-On

Define backup needs, equipment compatibility, trade responsibilities, and the test plan.

1

Define Backup Needs

List the equipment you want to run and its electrical ratings. A load calculation assesses demand, including equipment starting needs, to guide generator selection.

2

Review Placement & Approvals

Check equipment clearances, noise information, fuel supply, and local review requirements. Assign electrical, fuel, foundation, and permit responsibilities in the scope.

3

Install the Electrical Scope

Install the agreed transfer equipment and connections. Coordinate separate fuel work and other trades before startup.

4

Test & Hand Over

Check operation and transfer according to the equipment instructions and agreed test plan. Review operating limits, maintenance information, and required inspection records.

The Fox Difference

Why Fox for Generators

Backup Needs Defined

List the circuits and equipment that matter during an outage before selecting capacity.

Placement Reviewed Early

Check the proposed location against equipment instructions and local requirements before purchase.

Fuel Work Coordinated

Identify the responsible fuel contractor and review supply requirements alongside the electrical scope.

Transfer Operation Explained

Discuss startup delay, power interruption, and what the selected system can support.

Existing Systems Considered

Include any solar, battery, and sensitive equipment in the compatibility review.

Operating Responsibilities Clear

Confirm the startup, maintenance, user instructions, and written coverage for the selected equipment.

FAQ

Generator Questions

How is generator size selected?

Start with the equipment you want during an outage, its ratings, and starting requirements. Whole-home backup still needs a defined demand assessment; floor area alone cannot establish the required generator size.

How do placement and noise affect the project?

Use the exact model instructions and sound information to review proposed locations. Property layout, openings, fuel access, and local requirements may limit placement; confirm these before ordering equipment.

What maintenance will it need?

Maintenance depends on the model, fuel, and operating hours. Follow the manufacturer schedule and identify who will perform required service and any authorized startup work.

Is fuel piping included in electrical installation?

Fuel piping, any foundation work, and electrical installation need separate scope lines and assigned contractors. Confirm which items are included before comparing proposals.

Will power return immediately when the utility fails?

Startup and transfer time depend on the generator and control settings. Equipment can lose power during the transition; devices that require uninterrupted operation need a separate backup assessment.

Can a generator work with solar panels or a battery?

Compatibility depends on the exact equipment and system design. Review the generator, solar inverter, battery, and transfer controls together before adding connections; do not assume every combination is supported.

What approvals are needed?

Confirm local permit, placement, and any utility requirements for the proposed system. The proposal should identify who prepares each application and which fees and inspections are included.

What warranty applies?

Review the written terms for the exact equipment and installation proposal. Manufacturer coverage, installation workmanship, maintenance conditions, and service arrangements should be identified separately.

How much does a whole-house generator with transfer switch cost?

Generator size, supported equipment, transfer arrangement, fuel work, placement, and local approvals affect cost. A transfer switch changes the supply between utility and generator power. Review all of those items before comparing installation quotes.

Get in Touch

Planning Backup Power?

Tell us the location, equipment you want to support, and any existing solar or battery system. Call (650) 550-0719 or request an assessment.

Ask about the scope and fee for an assessment, diagnosis, or inspection before booking.

(650) 550-0719
Call Request a callback